How do I show different signs at different times (scheduling options)?

How do I show different signs at different times (scheduling options)?

There are 2 kinds of scheduling available in SignStix Director: 
  1. Campaign scheduling- allows you to prepare entire campaigns of content which will automatically be triggered across your estate when a certain date and time is reached.  This is convenient for managing large-scale seasonal changes in content.  Please see the following link for information re: this kind of scheduling: https://www.signstix.com/support/how-do-i-use-campaigns-to-control-what-signs-are-shown-where-and-when/
  2. Signage scheduling- allows you to specify what signage should be played on which days of the week at which times.  Please see the following ink for details: https://www.signstix.com/support/how-do-i-show-different-signs-at-different-times/

    • Related Articles

    • How do I customise signs to display different data at different sites? (Data Object tool)

      A data object allows you to define multiple 'tiers' of data (such as pricing).  This means that you do not have to create multiple versions of the same sign for modest changes in the data being displayed, rather, you can define a single sign with ...
    • How do I show/upload a PowerPoint presentation in SignStix?

      Currently, PowerPoint file formats are not accepted in SignStix.  However, there are 2 other options: Save the PowerPoint file as a multi-page PDF file.  This can be uploaded into Director and then the different slides can be converted into signs in ...
    • How do I create a sequence of signs?

      A sequence is a series of signs that will play one after the other in a loop.  To create a sequence: Navigate to the Content section in SignStix Director Select the + icon at the top of the page and choose 'New Sequence'  Name, tag, and add a ...
    • How do I use campaigns to control what signs are shown where and when?

      A campaign defines which content is assigned to play on each device or screen.  By default, this is a single campaign called 'My Campaign'.  In many scenarios, using a single campaign is ideal.  Content changes are handled simply by changing the ...
    • Why isn't my schedule working?

      There are 2 levels of scheduling- campaign scheduling and signage scheduling.  The campaign schedule determines which content is assigned to the zones during a given calendar period.  A signage schedule determines which signs are shown on different ...